TRF37T05EVM

Mfr. #: TRF37T05EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR TRF37T05
生命周期: 制造商新产品。
数据表: TRF37T05EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37T05EVM Overview

Compatible with TRF37T05. Product belongs to the - series. This product is categorized as Evaluation Boards Type: Modulator This product's 300MHz ~ 4GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37T05.

TRF37T05EVM Image

TRF37T05EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37T05EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37T05
  • Series -
  • Product Evaluation Boards
  • Type Modulator
  • Frequency 300MHz ~ 4GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37T05

TRF37T05EVM

TRF37T05EVM Specifications

TRF37T05EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF37T05.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Modulator

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 300MHz ~ 4GHz

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37T05.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top