TSC2003EVM-PDK

Mfr. #: TSC2003EVM-PDK
制造商: Texas Instruments
描述: Sensor Development Tools Touch Sensor Development Tools TSC2003-PDK Eval Mod
生命周期: 制造商新产品。
数据表: TSC2003EVM-PDK 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2003EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: - IC package type: TSC2003 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2003.

TSC2003EVM-PDK Image

TSC2003EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2003EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TSC2003
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2003

TSC2003EVM-PDK

TSC2003EVM-PDK Specifications

TSC2003EVM-PDK FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is Resistive Touch Sensors.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Touch Screen Controller.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TSC2003

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TSC2003.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top