TSC2003EVM

Mfr. #: TSC2003EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR TSC2003
生命周期: 制造商新产品。
数据表: TSC2003EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2003EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: - IC package type: TSC2003 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2003.

TSC2003EVM Image

TSC2003EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2003EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TSC2003
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2003

TSC2003EVM

TSC2003EVM Specifications

TSC2003EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Resistive Touch Sensors.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TSC2003.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TSC2003.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top