| Mfr. #: | TSC2007EVM |
|---|---|
| 制造商: | Texas Instruments |
| 描述: | TSC2007EVM |
| 生命周期: | 制造商新产品。 |
| 数据表: | TSC2007EVM 数据表 |


Product belongs to the - series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed USB-MODEVM amplifier. Sensitivity: - Interface: I2C Voltage Supply Range: - Touch Screen Sensing range of - Included item: Board. IC package type: TSC2007 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2007. 4-Wire USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the For-Use-With of the product?
Q: The For-Use-With of the product is USB-MODEVM.
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is -.
A: At what frequency does the Interface?
Q: The product Interface is I2C.
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is -.
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Touch Screen.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TSC2007
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2007
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is 4-Wire USB.