TSC2111EVM

Mfr. #: TSC2111EVM
制造商: Texas Instruments
描述: Sensor Development Tools Touch Sensor Development Tools TSC2111 Eval Mod
生命周期: 制造商新产品。
数据表: TSC2111EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2111EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2111 This product operates at a 2.7 V supply voltage for reliable performance. This tool is designed for the TSC2111.

TSC2111EVM Image

TSC2111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2111EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2111
  • Operating-Supply-Voltage 2.7 V
  • Tool-Is-For-Evaluation-Of TSC2111

TSC2111EVM

TSC2111EVM Specifications

TSC2111EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Resistive Touch Sensors.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Touch Screen Controller.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TSC2111.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.7 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2111

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top