TUSB7340EVM

Mfr. #: TUSB7340EVM
制造商: Texas Instruments
描述: BOARD REF DESIGN FOR TUSB7340
生命周期: 制造商新产品。
数据表: TUSB7340EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB7340EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: USB Bulk is the packaging method for this product The Interface, USB is the Main-Purpose. Primary-Attributes: PCI Express X1 Standard Height IC package type: TUSB7340 This product operates at a 5 V supply voltage for reliable performance. This product is an TUSB7340EVM board is a free-standing reference design for a four-port PCIebased SuperSpeed USB (USB 3.0) Extensible Host Controller (xHCI). This tool is designed for the TUSB7340. USB interface type Our product measures 4.38 in x 2.57 in in dimensions for compact and convenient use.

TUSB7340EVM Image

TUSB7340EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB7340EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type USB
  • Packaging Bulk
  • Main-Purpose Interface, USB
  • Primary-Attributes PCI Express X1 Standard Height
  • Embedded No
  • Utilized-IC-Part TUSB7340
  • Operating-Supply-Voltage 5 V
  • Description-Function TUSB7340EVM board is a free-standing reference design for a four-port PCIebased SuperSpeed USB (USB 3.0) Extensible Host Controller (xHCI)
  • Tool-Is-For-Evaluation-Of TUSB7340
  • Interface-Type USB
  • Dimensions 4.38 in x 2.57 in

TUSB7340EVM

TUSB7340EVM Specifications

TUSB7340EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed USB

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, USB.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is PCI Express X1 Standard Height.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TUSB7340.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed TUSB7340EVM board is a free-standing reference design for a four-port PCIebased SuperSpeed USB (USB 3.0) Extensible Host Controller (xHCI)

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TUSB7340

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 4.38 in x 2.57 in.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top