UCD9081EVM

Mfr. #: UCD9081EVM
制造商: Texas Instruments
描述: EVAL MODULE FOR UCD9081
生命周期: 制造商新产品。
数据表: UCD9081EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCD9081EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Supervisory Circuits The Power Management, Power Supply Supervisor/Tracker/Sequencer is the Main-Purpose. Primary-Attributes: 8 Channel Power Supply Sequencer IC package type: UCD9081 Output voltage: 2.6 V This tool is designed for the UCD9081. Our product measures 134.6 mm x 106.7 mm in dimensions for compact and convenient use. Input Voltage Range: 1.4 V to 2.4 V

UCD9081EVM Image

UCD9081EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCD9081EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Supervisory Circuits
  • Main-Purpose Power Management, Power Supply Supervisor/Tracker/Sequencer
  • Primary-Attributes 8 Channel Power Supply Sequencer
  • Embedded No
  • Utilized-IC-Part UCD9081
  • Output-Voltage 2.6 V
  • Tool-Is-For-Evaluation-Of UCD9081
  • Dimensions 134.6 mm x 106.7 mm
  • Input-Voltage 1.4 V to 2.4 V

UCD9081EVM

UCD9081EVM Specifications

UCD9081EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Supervisory Circuits.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Power Supply Supervisor/Tracker/Sequencer

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 8 Channel Power Supply Sequencer.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is UCD9081.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 2.6 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed UCD9081

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 134.6 mm x 106.7 mm.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 1.4 V to 2.4 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top