VCA2615EVM

Mfr. #: VCA2615EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR VCA2615
生命周期: 制造商新产品。
数据表: VCA2615EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2615EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Variable Gain Amplifiers Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 50MHz The 100 V/μs. Current-Output-Channel is 60mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2615 Board type: Fully Populated. The product has 2 - Dual channel per IC. This product operates at a 5 V +/- 5 V supply voltage for reliable performance. This tool is designed for the VCA2615. Our product measures 4.5 in x 3.5 in in dimensions for compact and convenient use.

VCA2615EVM Image

VCA2615EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2615EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Variable Gain Amplifiers
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 50MHz
  • Slew-Rate 100 V/μs
  • Current-Output-Channel 60mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2615
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -
  • Operating-Supply-Voltage 5 V +/- 5 V
  • Tool-Is-For-Evaluation-Of VCA2615
  • Dimensions 4.5 in x 3.5 in

VCA2615EVM

VCA2615EVM Specifications

VCA2615EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Variable Gain Amplifiers.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Differential.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 4.75 V ~ 5.25 V.

  • A: Is the cutoff frequency of the product -3db-Bandwidth?

    Q: Yes, the product's -3db-Bandwidth is indeed 50MHz

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed 100 V/μs

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 60mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Variable Gain.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is VCA2615.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 2 - Dual.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V +/- 5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is VCA2615.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 4.5 in x 3.5 in.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$172.52
US$172.52
10
US$163.89
US$1 638.89
100
US$155.26
US$15 526.35
500
US$146.64
US$73 318.90
1000
US$138.01
US$138 012.00
Top