VCA2617EVM

Mfr. #: VCA2617EVM
制造商: Texas Instruments
描述: EVALUATION MODULE FOR VCA2617
生命周期: 制造商新产品。
数据表: VCA2617EVM 数据表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2617EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 50MHz The 100 V/μs. Current-Output-Channel is 60mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2617 Board type: Fully Populated. The product has 2 - Dual channel per IC.

VCA2617EVM Image

VCA2617EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2617EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 50MHz
  • Slew-Rate 100 V/μs
  • Current-Output-Channel 60mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2617
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -

VCA2617EVM

VCA2617EVM Specifications

VCA2617EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Differential

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4.75 V ~ 5.25 V

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is 50MHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 100 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 60mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Variable Gain.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is VCA2617.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 2 - Dual.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
数量
单价
小计金额
1
US$223.50
US$223.50
10
US$212.32
US$2 123.25
100
US$201.15
US$20 115.00
500
US$189.98
US$94 987.50
1000
US$178.80
US$178 800.00
Top